Planned civil maintenance works at a wind farm for Wood
17208
wp-singular,post-template-default,single,single-post,postid-17208,single-format-standard,wp-theme-bridge,bridge-core-3.0.8,qi-blocks-1.4.3,qodef-gutenberg--no-touch,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode_grid_1300,qode-theme-ver-29.5,qode-theme-bridge,wpb-js-composer js-comp-ver-8.5,vc_responsive

Planned civil maintenance works at a wind farm for Wood

Planned civil maintenance works at a wind farm for Wood

Another busy week nearly done – we have been on a wind farm for Wood carrying out planned civil maintenance works as well as down in Cumbria for RES getting the summer maintenance underway. On top of all that we completed another CCTV infrastructure installation on another of the Osprey Charging Network sites in Cleethorpes. Good to get a few things off the list in the better weather.