Gas peaking site in Edinburgh
16549
wp-singular,post-template-default,single,single-post,postid-16549,single-format-standard,wp-theme-bridge,bridge-core-3.0.8,qi-blocks-1.4.3,qodef-gutenberg--no-touch,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode_grid_1300,qode-theme-ver-29.5,qode-theme-bridge,wpb-js-composer js-comp-ver-8.5,vc_responsive

Gas peaking site in Edinburgh

Gas peaking site in Edinburgh

The Wallace team have been working on this gas peaking site in Edinburgh for the last 6 months. We have been supporting our client with procuring, constructing and the electrical fit out for a new secondary DNO building, backfilling and reinstating cable trenches and constructing a sleeper retaining wall and drainage to protect the adjacent properties.