Foresight Group – Wind Asset Management
16810
wp-singular,portfolio_page-template-default,single,single-portfolio_page,postid-16810,wp-theme-bridge,bridge-core-3.0.8,qi-blocks-1.4.3,qodef-gutenberg--no-touch,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode_grid_1300,qode-theme-ver-29.5,qode-theme-bridge,wpb-js-composer js-comp-ver-8.5,vc_responsive

Foresight Group – Wind Asset Management

Foresight Group – Wind Asset Management

  • Project: PiP FiT Wind Portfolio (31 x Sites, UK Wide)
  • Client: Foresight Group;
  • Start Date: January 2022 – On-going
  • Project Details: Technical Asset Manager for 31 Single Feed in Tariff Wind Turbines across the UK;
  • Role: Technical Asset Management, HSEQ Management, Balance of Plant Maintenance and HV Operation and Maintenance

Wallace DS staff first worked on this portfolio in 2014 where they were responsible for the project management and balance of plant infrastructure for this UK wide fleet.  After a short time away from the day to day operations of the portfolio, Wallace DS took the reins again in 2022 and are responsible for the day to day site management, technical asset management, HSEQ compliance and all balance of plant and HV maintenance across the fleet with a range of technologies (EWT, Enercon and Acciona).  With Wallace DS’s in-house technicians, engineers and civils and HV teams we are well placed to keeping these assets in a safe working condition for our client.